On the Sun stream from above, we now have at least 10-15 folks with flashlights on the decking and old pile walking around. (Hazmat/Assessment /Structural Engineer guys I would guess)
ETA: Per scanner - They are now clearing fire trucks and battalions etc (they were sent in in case needed for aid during demo... not the search and rescue folks)
ETA #2: Per Sun livestream above - The 10-15 folks are now exiting by the pool.
ETA #3: Per scanner - (11:45 pm) Alpha Construction is to remove the tarp soon. (Was put on old pile to separate from new debris field, as 1/3rd of the old pile was never searched due to danger when building was standing) Awaiting final clearance on air sampling (nothing noted so far as an issue). ETA 5-10 minutes.
ETA #4: 11:48 pm...Hazmat has one issue... Was transformer drained of oil prior to implosion? .... should not interfere with operations at this time. Structural has cleared etc.
ETA #5: 11:50. 80 minutes post collapse......Clear to go in now and do a game plan. It's a GO... for the first phase of planners to begin resumption of search and rescue/recovery operation.
ETA #6: ALL CLEAR Approval have been given at 11:57 pm for Hydrocleaner operation (wetting down) and tarp removal ..to be done first.
Outta here now for the night. May those affected be in our thoughts and prayers............ Night all. (For those that want to follow... Sun YouTube for visual and YouTube that has the scanner is above here in this page if you want to follow overnight efforts)..........and this is media by NYT that is doing a rolling update.(and has a haunting photo MOO)..